Your current browser is not supported. We built DIRTT.net with the latest technology to bring you a better experience. To view DIRTT.net, we recommend using the latest version of Chrome, Safari, Firefox or Microsoft Edge. 

DIRTT
  • Location
    Calgary, Alberta
  • Year
    2017
  • Duration
    6
    weeks
  • Build type
    new build
  • Sq Ft
    1600

A taproom as good as the beer

This local brewer wanted their taproom to attest to their focus: good beer, good people, with no distractions. But, they needed to do it on a very tight timeline and include some special customizations. With just six weeks to go until the official opening, we had custom millwork to complete along with a feature timber structure with the brewery’s logo at the center. The end result? Annex Ale Project was thrilled.

Download photos

 

DIRTT managed to produce and install the millwork and timber frame like no one else could. Our taproom receives as much positive feedback as our beers do.

Andrew Bullied, co-owner & brewmaster, Annex Ale Project
  • Take A Tour

    Photo Credit: Nader Essa Photography
  • Photo Credit: Nader Essa Photography
  • Photo Credit: Nader Essa Photography
  • Photo Credit: Nader Essa Photography
12
Details

Design freedom and certainty

DIRTT Millwork gives you complete design freedom without paying for the cost of custom. All on fast and certain DIRTT lead times.

Details

Timber for today

DIRTT Timber Frame combines traditional craftsmanship with 21st century technology. It’s a truly sustainable solution.

Ready to start your project? Join thousands of happy clients who love their space. Need more time? Sign up below to get news and updates until you’re ready for a better way to build.

Let's Talk

Close