Newsletter Sign Up

Scientific Laboratory Offices

Good planning to integrate with the base building

  • Location

    Batavia, Illinois

  • SQ FT

    16,163

  • DIRTT INSTALL

    2 weeks

  • DIRTT Construction Partner

    Accelerate Built Environments

How do you transform 16,163 square feet from vacant space to complete offices in just two weeks? The science and technology behind DIRTT was a perfect fit for these scientific laboratory offices. Careful planning ensured DIRTT integrated with the base building conditions. Anticipated on-site adjustments by the installer made for a precision fit around the steel beams. Casework seamlessly integrates with third party pieces. Writable surfaces encourage collaboration for the next scientific discovery.

Product Spotlight

Scroll horizontally to move
the image

Project Includes:

    01

    PLAN

    Discover how DIRTT can bring the most value to your project.

    02

    TRANSLATE

    Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

    03

    MANUFACTURE

    With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

    04

    INSTALL

    DIRTT components are rapidly installed on a clean job site with less waste.

    05

    ADAPT

    Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

Contact form

Ready to get started?

Connect with a DIRTT construction specialist to bring your next project to life.

© DIRTT 2024